FIFC Apam Project Site: AREA A

Area A will be developed as a storage terminal for gasoline and gasoil products, pumped via a subsea pipeline from an off-shore marine CBM terminal. Fire-fighting and workshop facilities as well as 5Ha of serviced and surfaced light industrial development space, for lease or sale to light industrial services tenants are also planned.

AREA A: Storage, Offices and Industrial Area
Area A Facilities

 

  1. 15,000-60,000DWT CBM marine terminal, 4-point anchor system, PLEM and flexible hosing

  2. 7km 18” subsea pipeline, pig gable, transfer rate 30,000 tons in 36 hrs

  3. 160 000m3 capacity onshore tank farm. 8 tanks, 4x 20 000m3 gasoil, 4x 20 000m3 gasoline

  4. 1 km long 20m wide access jetty for service tugs.

  5. 5Ha of serviced and surfaced light industrial development space, for lease or sale to ligh industrial services tenants.

STORAGE FACILITY

A gasoline and gas oil storage terminal consisting of eight storage tanks with a total storage capacity of 160 000m3. Fire-fighting and workshops facilities are planned to service the storage terminal.

.

OFFICES

Approximately 400m2 of office space to serve as an operational centre for

the products storage terminal and LPG, gasoline and gasoil distribution facilities

.

INDUSTRIAL AREA

5Ha of serviced light industrial development space, for lease or sale to light industrial services tenants. The main operations anticipated will include logistical support, pipe storage, forklift and crane services, welding and fabrication

.